Our process
Four steps.
No surprises.
Every project runs the same way, whether it is forty doors or a full elevator bank. Here is exactly what happens, in what order, and what it asks of your building.
Occupied buildings
Nationwide installation
Step by step
What each step actually involves.
No change orders hidden in the middle of the job. The scope you approve at step two is the scope we install at step three.
Step 1
Consult
We walk the surfaces, confirm they will take film, and define scope, schedule, and budget.
- Doors, cabs, landings, millwork, and glass counted surface by surface
- Substrate and condition assessment, so nothing fails behind the film
- Written scope with phasing that matches how the building operates
Step 2
Specify
You pick from 1,000+ finishes across 3M DI-NOC, Belbien, Reatec, Benif, Bodaq, and Renuva. Samples ship before you commit.
- Physical samples held against the actual door, cab, or desk
- Fire rating and warranty documentation for the specified film
- Budget priced per door, per cab, and per linear foot
Step 3
Install
In-house crews prep, wrap, and edge-seal around your operations. Nights, weekends, or floor by floor.
- Nights, weekends, or phased floors, whichever the property needs
- Containment, floor protection, and a clean handoff every morning
- Hardware removed, wrapped around, and rehung the same visit
Step 4
Walkthrough
Every edge, corner, and seam is checked before we turn the surface back over.
- Joint inspection with your team, surface by surface
- Punch list closed before the crew leaves the property
- Care instructions and one point of contact for the warranty term
Working in a live building
The building keeps working while we do.
Resurfacing only makes sense if occupancy survives it. These three rules decide how the schedule is built.
01
Occupied by design
Guests, tenants, and staff keep moving. We work in the hours the building is quiet, so no floor, cab, or suite closes for the project.
02
Containment, not chaos
Floor protection, negative-air containment where dust matters, and every scrap of film waste removed at the end of each shift.
03
One crew, one contact
The people who scope the job are the people on site. A single project lead answers for schedule, quality, and building access.
Before the walk-through
Four things to send.
A phone photo and a door count are usually enough to tell you whether film is the right call and what the scope would cost.
Request a quoteStart at step one
Send us the property and we will scope it.
We will confirm the surfaces, flag anything that will not take film, and put a number and a schedule against it.